What’s the Core Difference?

Structural steel is your ready-to-go, high-strength alloy superhero: forged off-site, delivered in neatly bolted pieces, ready for battle.

Concrete? It’s the slow-cooker of construction – a rough mix of cement, gravel, and water poured into moulds, left to “cook” over time.

Boiled down:

  • Steel frames are precision-fabricated to tolerances of ±3mm – almost surgical.
  • Concrete? Depends on good weather, better timing, and best guesses unless you’re Norman Foster.

Picture it: Five storeys rising over Oxford Street. Steel frame goes up 6–8 weeks faster, while the concrete crew next door are still praying for no rain.

Steel is your lightweight precision tool. Concrete is your heavyweight bruiser. We like steel here at UIS (see here).

Which Is More Cost-Effective?

Upfront Costs

Sure, concrete wears the crown when it comes to material cost: £90–£130/m³ vs steel’s lofty £1,200–£1,600/tonne.

But – and it’s a big but – if your jobsite is burning cash by the day, speed beats savings.

Always budget for formwork and scaffolding if concrete’s your pick – that’s £45–£80/m² sneaking into your margins.

Labour and Time

Steel erection crews? They’re like a Formula 1 pit team – bang, bolt, move on (50–100 tonnes/week).

Concrete? More like marathon runners – pouring 40–60m³/day if the sun behaves.

Example:

Picture a Heathrow hotel project. Switching to steel slashes the fit-out start by four weeks, saving £120,000–£160,000. Enough for a new crane… or three.

Long-Term Costs

Steel needs a 15–25 year maintenance plan if you’re anywhere near salty air.

Concrete may look carefree – until carbonation creeps in like damp in an old pub.

Summary: Steel can look pricey upfront – but it often leaves concrete crying over lost prelims and overtime.

supporting steel beams against wall manchester

Learn how to choose a structural steelwork contractor here.

What Performs Better Structurally?

Load-Bearing Capacity

  • Steel’s yield strength:250–460 MPa – think bridge cables.
  • Concrete’s compressive might:25–100 MPa – solid, but with a secret soft spot (needs rebar to flex).

Pro Tip: For spans over 8m, steel cuts your beam weight – and your foundation bill – down by 20–30%.

Design Flexibility

Steel’s your yoga master:

  • Slim columns like 152 UC 23s (tiny compared to concrete’s chunky 500mm squares).
  • Roomier layouts. More lettable space. More coffee shops at street level.

Example:

In a retail warehouse, portal frame steel delivered a 15m clear span without a jungle of columns.
Concrete? Would’ve needed a column forest.

Fire Resistance

Concrete laughs at fire (2–4 hours of natural resistance).

Steel needs help – intumescent coatings at £15–£25/m², or you’ll be left with spaghetti beams.

Steel burns faster than your bacon on a Sunday morning if left naked. Fireproof it. No excuses.

Summary: Want open, airy, reconfigurable spaces? Steel. Need a bunker that shrugs off a fire? Concrete.

flt entrance roxane water

Which Is More Sustainable?

Material Sourcing

  • Steel: 90% recycled on a good day, ResponsibleSteel™ certified if you’re smart.
  • Concrete: Cement production belches out 820 kg of CO₂/tonne – unless you get clever with GGBS or PFA.

(Ask any engineer worth his IStructE badge: “Green concrete” still needs scrutiny.)

Energy Use

Steel’s energy burn: 20–35 MJ/kg.

Concrete’s: 1–2 MJ/kg – but recycling it is like trying to turn scrambled eggs back into a raw egg.

Certifications

  • BES 6001: check.
  • BREEAM Materials credits: check, but only if you plan early.

Summary: Steel closes the loop better. Concrete can be cleaned up – but never totally guilt-free.

What Are the Build Constraints?

Site Access

  • Steel arrives like an Amazon Prime order – cranes, bolts, done.
  • Concrete needs a battalion of trucks, pumps, pour teams, and prayers for weather.

Weather Tolerance

Steel doesn’t care if it drizzles.

Concrete does. Cold snap? You’re paying £20–£50/m³ for thermal blankets.

Sub-zero pours? Don’t even think about it without accelerators or heated formwork.

Summary: Steel suits UK weather tantrums. Concrete demands pampering.

internal staircase cad design 3

What Are the Main Use Cases?

Steel rules:

  • 10–20m clear spans? Check.
  • Rooftop extensions? Featherlight.
  • Pop-up stores and pavilions? Plug and play.

Concrete dominates:

  • Basements fighting groundwater?
  • 100-year bridges?
  • Apartments needing 50dB soundproofing?

Example:

The Shard’s secret?

Concrete core for strength.

Steel exoskeleton for that dazzling slenderness you photograph every time you pass London Bridge.

Think of it like Batman’s armour: concrete for the muscle, steel for the agility.

Summary: Steel: nimble strength. Concrete: stubborn permanence.

What Are the Material Options?

Structural Steel Types

  • Hot-Rolled (S355/S275): workhorses.
  • Cold-Formed (EN 1993-1-3): the lightweights.
  • Pre-Engineered: the IKEA kits of construction – but sturdy.

Concrete Types

  • Reinforced (RC): standard bearers.
  • Precast: Lego bricks for grownups.
  • Prestressed: taut, tense, ready to span motorways.

Example:

Multi-storey car parks swear by precast concrete – modular panels strong enough to shrug off winter salt and boy racers.

Summary: Pick your fighter based on factory vs field, not just material.

riveted steel bridge

What Should You Watch Out For?

Potential Pitfalls

  • Steel + sea air + lazy maintenance = corrosion faster than a soggy fish and chips.
  • Concrete: Ignore cover depths, and chlorides will sneak in faster than a tabloid rumour.

Always specify C40/50 concrete with waterproof additives for coastal builds.

Engineering Support

Design to Eurocodes, check National Annexes, and don’t be the guy guessing at rebar spacing on site.

(Trust Building.co.uk or Construction News – they’ll roast you alive otherwise.)

Summary: Ignore the devil in the details and you’ll pay for it in remediations.

How to Decide?

Quick Expert Matrix:

Priority Choose Steel Choose Concrete
Speed of Construction High (8–10 floors/month) Lower (3–4 floors/month)
Large Open Spaces High (12m+ spans) Medium (8m max without PT)
Fire Performance Needs treatment Natural 2–4h rating
Initial Material Cost Higher Lower
Future Adaptability Extensions easy Major surgery needed
Heavy Thermal Mass High
Recyclability Strong Limited
Dead Load Weight 0.5–0.7t/m³ 2.4t/m³

Jacob Hughes is a Director at Universal Industrial Services, one of the UK's leading specialists in structural steelwork, architectural metalwork, and bespoke fabrication. With over a decade of leadership experience in the industry, Jacob oversees all aspects of project delivery - from strategic planning and compliance to client relations and operational excellence.

Following the vision set by his father, company founder Neil Hughes, Jacob plays a critical role in maintaining the high standards, safety practices, and innovative approaches that Universal Industrial Services is known for. He is deeply committed to upholding the company's BS EN 1090 certification and CHAS Advanced accreditation, ensuring that every project meets the highest quality and regulatory benchmarks.

While Jacob’s day-to-day role focuses on business development and project oversight, he works closely with Universal’s highly skilled engineering and fabrication teams to deliver complex projects across the UK. His leadership supports the company’s mission to invest in people, technology, and sustainable practices, helping clients achieve outstanding results in every project.

Outside of work, Jacob is passionate about driving innovation within the steel and metalwork sectors and continues to champion professional development within the Universal Industrial Services workforce.

Back To Top