Goole docks
The docks keep Britain's furthest-inland port working, with storage sheds and cargo frames on long-used ground. We design foundations to the site investigation and spans to the cargo.
Goole built itself around an inland port, and its docks, the M62 Junction 36 distribution parks and the Ouse-side villages keep steel-framed sheds in constant use. We design, fabricate to BS EN 1090 Execution Class 2 at our South Yorkshire workshop and install industrial steel buildings across the port hinterland with our own directly employed teams.
















Big things are happening over in Leeds! One of our teams is beginning to install a 40T walkway. Our dedicated site team has completed the first phase of the walkway installation. Over three days,...
View this project →
A free site visit anywhere in Goole. Drawings, access and specifications logged. Same-day quote on small domestic industrial steel buildings enquiries; 1-2 weeks on large commercial tenders with a full take-off.
Detailed, fabricated and finished in our own workshop under BS EN 1090 Execution Class 2. QA pack, mill certs and traceability documentation ready before delivery.
We schedule delivery to your Goole site on our own transport, around your access windows and site programme, not third-party haulage timetables.
Directly employed CSCS-carded crew with their own MEWPs. Full RAMS pack, as-built drawings and 12-month defect liability at handover.
UB and UC primary frames, bracing, columns, purlins and rails, edge protection, plant decks, stair cores, and mezzanine steelwork. Fabricated to BS
Lifting plans are written in-house, by someone who knows how things actually work on the ground - the same team who planned
Tekla modelling, BIM coordination at LOD 300+, FEA where specified, and 3D site scanning on retrofit packages - the mezzanine floor at
Tier-1 commercial, live retail refurbishment, live leisure, research and laboratory, and reclaimed structural steel.
The same standards, capacity and accountability on every job, wherever the site.
Tap a postcode for a quick note on the area plus a map. We cover the wider region and install UK-wide, tell us your postcode.
The docks keep Britain's furthest-inland port working, with storage sheds and cargo frames on long-used ground. We design foundations to the site investigation and spans to the cargo.
← Drag / swipe to browse · click to expand →
"I've worked with UIS for several years on some high profile and very complex projects. Their attitude and work ethic are second to none - providing high quality services and products which are delivered safely and on time every time. Overall they are a pleasure to do business with and wouldn't hesitate recommending UIS for any steelwork or metalwork packages."
Goole steel buildings run from warehouse frames by the docks to distribution units at the motorway junction and farm buildings on the levels. We design, fabricate and install in-house, and stay on for the aftercare.
Start your quoteYes. We design in-house, fabricate at our South Yorkshire workshop and install across Goole, Howden and the port hinterland with our own directly employed teams, delivering on our own transport.
Yes. The Junction 36 plots take 25 to 45 metre clear spans with dock levellers and yard circulation designed in from the first drawing. We design, fabricate and erect the package complete.
The levels around Goole sit close to river datum, so floor levels, drainage falls and flood requirements lead the design. We set frame and base details to your flood risk assessment, not a generic assumption.
Yes. Dockside storage needs wide spans, high eaves and doors sized to the cargo, on ground that has worked hard for a century. We design foundations to the site investigation and verify bases before steel goes up.
BS EN 1090 Execution Class 2 with UKCA marking, coded welders to BS EN ISO 9606, ISO 9001, CHAS Elite, SafeContractor and ConstructionLine Gold, backed by GBP 10m public and GBP 10m employers liability.
Footprint, eaves height and use, the site postcode, target dates and whether you need installation as well as the fabricated frame. A dimensioned sketch is enough for us to start.
Our mild steel workshop has been busy this week fabricating and welding the structural steelwork for a unique project we have on down in Lon...
Read case study →
We are proud to share that our team has successfully completed and installed another high-quality steelwork package right in the heart of Lo...
Read case study →
We are proud to announce the successful completion of another project here at UIS for Thermo Fisher Scientific in Horsham. Our team was t...
Read case study →See our full industrial steel buildings coverage across Yorkshire, or jump to a nearby area below.
We work from our own fabrication facility in Rotherham, South Yorkshire, and deliver and install across Goole and the UK with our own teams and transport, one accountable team from enquiry to handover.