Steel Columns & Posts
The vertical steel that carries your building down to its foundations. We detail, fabricate and install universal columns, hollow-section posts and their baseplates to BS EN 1090 Execution Class 2.

















The steel that carries the load to the ground.
Columns and posts take every load in the frame and carry it safely to the ground, so they have to be fabricated accurately and connected properly. We work from your structural engineer's design to detail, fabricate and install universal columns, structural hollow-section posts, and the baseplates, cap plates and splices that go with them. Everything is made in our own workshop to BS EN 1090 Execution Class 2, UKCA marked, and erected by our own teams, so the steel that holds your building up is the responsibility of one firm from drawing to handover.
Columns, posts and everything that anchors them.
Universal columns, hollow-section posts, baseplates and splices, fabricated to your engineer's schedule and erected by our own teams.
Universal columns
UC sections cut, drilled and fabricated to your engineer's schedule, with the cap and base connections ready to bolt up on site.
Hollow-section posts
SHS, RHS and CHS posts for exposed and lighter structures, fabricated where a clean section is wanted over an open flange.
Baseplates and grillages
Column baseplates and load-spreading grillages, stiffened to suit the load and drilled for the holding-down bolts.
Splices and cap plates
Column splices, cap plates and bearing details for multi-lift frames, detailed so the erection sequence stays simple.
Connection into the frame
Beam-to-column connections, cleats and stiffeners fabricated so the columns tie cleanly into the beams around them.
Get the columns right and the rest of the frame follows.
Columns set out the whole frame, so accuracy at the baseplate and the splice is what keeps a build on programme. We fabricate to BS EN 1090 Execution Class 2, mark every member for a clear erection sequence, and install with our own teams, backed by the drawings and the declaration of performance your building control officer expects.
Request a quote
Project & sample images.
← Drag / swipe to browse · click to expand →
Why contractors trust our columns.
Columns set out the frame, so we keep them accurate from baseplate to splice.
About UIS-
01
Fabricated in our own workshop
Columns are cut, drilled and welded on our own lines, so setting-out and tolerances stay under our control from the first member to the last.
-
02
Coded welding, traceable
Structural welds are made by welders tested to BS EN ISO 9606, with the records handed over so the frame is signed off without a query.
-
03
BS EN 1090 Execution Class 2, UKCA marked
Made to the execution class your engineer specifies, with the declaration of performance to match.
-
04
Detail to installation
We detail from your engineer's design, fabricate, then erect with our own teams, so the frame goes up in the sequence we drew it.
"I've worked with UIS for several years on some high profile and very complex projects. Their attitude and work ethic are second to none - providing high quality services and products which are delivered safely and on time every time. Overall they are a pleasure to do business with and wouldn't hesitate recommending UIS for any steelwork or metalwork packages."
Questions clients ask us.
We fabricate universal columns (UC) and structural hollow sections (SHS, RHS and CHS) for posts, along with the baseplates, splices and cap plates that complete them, all to your engineer's schedule.
Yes. We fabricate the baseplates, stiffened to suit the load, and provide the holding-down bolt assemblies with setting-out templates for the groundworks team.
Yes. Our own directly employed teams erect the steel, so the columns are installed by the same firm that fabricated them, in the sequence we detailed.
BS EN 1090 Execution Class 2 with UKCA marking, welded by coded welders to BS EN ISO 9606, with the declaration of performance supplied.
We are based in South Yorkshire and design, fabricate and install across the UK with our own teams.
Recent project deep-dives.
3 Chamberlain Square Birmingham
We're excited to share a glimpse of our site team's accomplishments as they commenced the installation of the rooftop steelwork in partn...
Read case study →
40T Walkway in Leeds
Big things are happening over in Leeds! One of our teams is beginning to install a 40T walkway. Our dedicated site team has completed the...
Read case study →
Oban Plant Deck Platform, Scotland
We're proud to announce the successful completion of our latest project - the installation of a plant deck platform in Oban, Scotland....
Read case study →