Steelwork Installation
CSCS-carded site teams, in-house Appointed Person writing the lift plan, and the workshop reachable on the phone during erection - installation-led since 1994.

















What we deliver.
Steel erection is only as reliable as the chain from fabrication to lift plan to site crew. We manage all three. Our installation teams write their own lift plans through our in-house Appointed Person, and the fabrication team is on the phone during erection because it's the same company that drew the package. Neil Hughes founded UIS in 1994 as an installation business - fabrication came later - and that heritage means every weld decision, detailing choice, and material spec is made with site conditions and lifting sequence in mind. As an example, we lifted the 40-tonne walkway at a tight-access Leeds site by tower crane over three days, installed the night-shift plant deck inside an operational Oban supermarket, and built the access stairway around an embankment at Thermo Fisher Horsham - projects we're really proud of.
What we make.
Every project follows the same certified workflow - so you get the same outcome whether we're making one beam or a thousand.
CSCS site teams
Our installation crews are led by an SSSTS supervisor on every project, with CSCS, PASMA, IPAF, and first aid certification across the workforce. The person arriving at your site has read the same drawings the welder was working from and knows who to call if a connection needs attention.
In-house Appointed Person for lifting
Every UIS erection goes through our own Appointed Person for lift plan sign-off. The AP who signed off the Leeds 40-tonne tower-crane lift knows the fabrication, the detailing, and the site constraints because it's the same company.
Live-environment and out-of-hours capability
Night-shift installation inside operational retail (Oban supermarket plant deck), live retail fit-out (Foot Asylum Oxford Street), live hospitality (Botree Hotel), laboratory refurbishment (Thermo Fisher Horsham). Phased access, noise limits, shutdown windows, and fire-watch provision planned at briefing - not improvised on arrival.
Site welding discipline when needed
Prefabrication-first is the default - every joint pre-welded in the workshop is one fewer hot-works permit on your floor. Where site welding is required, full RAMS, hot-work permits, and fire watches are issued as standard. Coded welders to BS EN ISO 9606 travel with the erection crew.
Craftsmanship. Accountability. No shortcuts.
No subcontracted welders. No outsourced site crews. Every project from 3D model to final torque-check is handled by a certified UIS team from our Rotherham facility.
Tour our workshop
Project & sample images.
← Drag / swipe to browse · click to expand →
Four reasons we stay on your shortlist.
The same four reasons come up whether you're a tier-one contractor, architect or self-builder.
About UIS-
01
Accreditations & compliance
BS EN 1090 Execution Class 2. CHAS Elite, Alcumus SafeContractor, ISO 9001. Every project ships with a full QA pack.
-
02
Experience & capabilities
Thirty years in business. Drawing board to torque-check happens in-house - no split accountability.
-
03
People & values
CSCS operatives. Coded welders. Chartered draughtsmen. A family firm that treats your project like their own.
-
04
Innovation & sustainability
Tekla 3D modelling. Automated welding cells. GRP composite solutions where steel isn't the right answer.
"Having dealt with UIS for over six years, rarely have I come across a more pro-active company with a can-do attitude and a "nothing will beat us" culture. Within all aspects of the industry - Brass Balustrade, Stainless Steel Handrail, Bridges, Secondary Steel or plain and simple Portal Frames - their approach and attitude to delivering the same high quality project is always the same."
Questions clients ask us.
Both. Install-only is available where you already have fabricated steel from another supplier and need a competent erection crew - we'll review the fabrication package, produce lift plans and method statements, and erect to programme. Supply-and-install is the standard offer and reduces the coordination risk that causes most steel packages to slip programme.
Our in-house Appointed Person - not the crane-hire contact and not a third-party lifting consultant. The same AP wrote the plan for the 40-tonne tower-crane lift through tight Leeds access and the night-shift Oban plant deck. Lift plans include sequence, rigging, exclusion zones, and weather contingencies - reviewed with the site manager before mobilisation.
Yes - standard practice for our crews. Night shifts at Oban supermarket plant deck, live retail fit-out at Foot Asylum Oxford Street, live hospitality at the Botree Hotel, live laboratory at Thermo Fisher Horsham. Phased-access, out-of-hours, and fire-watch-heavy installations are planned at briefing stage with the facilities team, not improvised by the crew on arrival.
SSSTS supervision on every project. CSCS site-safety cards across the workforce. PASMA mobile-tower and IPAF MEWP certification for operatives working at height. First-aid-qualified personnel in every crew. Coded welders individually qualified to BS EN ISO 9606 travelling with the erection team where site welding is in scope.
Recent project deep-dives.
Reclaimed Structural Steelwork Project London November 2025
Our mild steel workshop has been busy this week fabricating and welding the structural steelwork for a unique project we have on down in Lon...
Read case study →
Stainless Steel Powder Coated Handrails with LED Lighting December 2025
Another successful project completed and handed over! ✅ 😘 Our client requested ourselves to supply and install the stainless steel p...
Read case study →
Large Steel Construction and Erection Project London December 2025
We are proud to share that our team has successfully completed and installed another high-quality steelwork package right in the heart of Lo...
Read case study →