York city centre
Inside the walls, structural work means floor strengthening, trimming around new stairs and lifts, and beams threaded into retained buildings. We detail for piece-small erection where cranes cannot work.
York's structural work splits between the walled centre, where steel goes in beam by beam behind retained frontages, and the ring-road business parks, where frames, mezzanines and walkways carry the commercial growth. We design in-house, fabricate at our South Yorkshire workshop to BS EN 1090 Execution Class 2 and install across the city with our own directly employed teams.
















Big things are happening over in Leeds! One of our teams is beginning to install a 40T walkway. Our dedicated site team has completed the first phase of the walkway installation. Over three days,...
View this project →
A free site visit anywhere in York. Drawings, access and specifications logged. Same-day quote on small domestic structural steelwork enquiries; 1-2 weeks on large commercial tenders with a full take-off.
Detailed, fabricated and finished in our own workshop under BS EN 1090 Execution Class 2. QA pack, mill certs and traceability documentation ready before delivery.
We schedule delivery to your York site on our own transport, around your access windows and site programme, not third-party haulage timetables.
Directly employed CSCS-carded crew with their own MEWPs. Full RAMS pack, as-built drawings and 12-month defect liability at handover.
UB and UC primary frames, bracing, columns, purlins and rails, edge protection, plant decks, stair cores, and mezzanine steelwork. Fabricated to BS
Lifting plans are written in-house, by someone who knows how things actually work on the ground - the same team who planned
Tekla modelling, BIM coordination at LOD 300+, FEA where specified, and 3D site scanning on retrofit packages - the mezzanine floor at
Tier-1 commercial, live retail refurbishment, live leisure, research and laboratory, and reclaimed structural steel.
The same standards, capacity and accountability on every job, wherever the site.
Tap a postcode for a quick note on the area plus a map. We cover the wider region and install UK-wide, tell us your postcode.
Inside the walls, structural work means floor strengthening, trimming around new stairs and lifts, and beams threaded into retained buildings. We detail for piece-small erection where cranes cannot work.
We do more than structural steelwork in York. Same directly-employed teams, same BS EN 1090 workshop, on every service below.
← Drag / swipe to browse · click to expand →
"I've worked with UIS for several years on some high profile and very complex projects. Their attitude and work ethic are second to none - providing high quality services and products which are delivered safely and on time every time. Overall they are a pleasure to do business with and wouldn't hesitate recommending UIS for any steelwork or metalwork packages."
York structural steelwork runs from beams and trimming steel in city-centre refurbishments to portal frames, mezzanines and walkway packages on the business parks. We design, fabricate and install as one company, and stay on for the aftercare.
Start your quoteYes. Beams, columns and trimming steel for commercial refurbishments and structural alterations are our standard work. We fabricate to BS EN 1090 Execution Class 2, deliver on our own transport and install with directly employed crews.
Yes. Much of the centre means restricted access, no crane positions and party structures, so we detail connections for piece-small erection and hand-balanced installation, coordinated with your engineer and the conservation officer's conditions.
Yes. Access walkways, gantries, plant platforms and mezzanine floors run through the same design, fabrication and installation route as our frames, with handrails and flooring delivered as part of the package.
Either. We can take your structural engineer's design and deliver the connection detailing, fabrication and erection, or carry the structural design in-house where the project suits it. One company stays accountable through to the aftercare.
BS EN 1090 Execution Class 2 with UKCA marking, coded welders to BS EN ISO 9606, ISO 9001, CHAS Elite, SafeContractor and ConstructionLine Gold, backed by GBP 10m public and GBP 10m employers liability.
The engineer's or architect's drawings if you have them, the beam sizes or spans involved, the site postcode, your programme dates and whether you need installation as well as supply. A marked-up sketch is enough to start the conversation.
Our mild steel workshop has been busy this week fabricating and welding the structural steelwork for a unique project we have on down in Lon...
Read case study →
We are proud to share that our team has successfully completed and installed another high-quality steelwork package right in the heart of Lo...
Read case study →
We are proud to announce the successful completion of another project here at UIS for Thermo Fisher Scientific in Horsham. Our team was t...
Read case study →See our full structural steelwork coverage across Yorkshire, or jump to a nearby area below.
We work from our own fabrication facility in Rotherham, South Yorkshire, and deliver and install across York and the UK with our own teams and transport, one accountable team from enquiry to handover.