Warehouse & Distribution Centre Steelwork

The portal-frame steel behind warehouses and distribution centres. We design, fabricate and install clear-span steel frames, mezzanines and support steel to BS EN 1090 Execution Class 2.

30 +
Years Experience
1k +
Projects
EXC 2
BS EN 1090
- Spec In-house Design → Install
Certified & compliance-audited
About this service

The steel that opens up the floor.

Warehouses and distribution centres live or die on clear, usable space and a fast programme. The steel frame delivers both: wide clear spans with no internal columns to work around, and a structure that goes up quickly and predictably. We design, fabricate and install the portal frames, eaves and edge steel, bracing and mezzanine floors that make up a warehouse structure, all to BS EN 1090 Execution Class 2 and erected by our own teams, so the steelwork stays on programme from the first column to the last purlin cleat.

The steel that opens up the floor.
- 30yrs Since 1994 Rotherham · In-house
What we make

Everything in a warehouse frame.

Portal frames, mezzanines, secondary steel and loading structures, fabricated and erected by our own teams.

01

Portal frames

Clear-span portal frames that open up the floor for racking, machinery and forklift routes without internal columns.

02

Mezzanine floors

Steel mezzanines for offices, pick towers and extra storage inside the building envelope.

03

Secondary steel

Purlins, side rails, eaves beams and bracing that carry the cladding and keep the frame stable.

04

Loading and canopy steel

Steel for loading bays, canopies and dock structures at the building perimeter.

05

Craneage and erection

Lift planning, sequencing and erection by our own teams, so the frame goes up safely and on programme.

Why UIS

Clear spans, fast erection, one accountable team.

A distribution shed is a race against the programme, so the steel has to arrive right and go up fast. We fabricate the portal frames and secondary steel to BS EN 1090 Execution Class 2, plan the erection sequence and craneage, and install with our own teams, coordinating with the cladding and groundworks trades so the frame is signed off on schedule.

Request a quote
large white mezzanine floor project tgc mechanical services
Examples

Project & sample images.

← Drag / swipe to browse · click to expand →

Why choose UIS

Why warehouse steel is about the programme.

A distribution shed is a race against the schedule, so the steel has to arrive right and go up fast.

About UIS
  • 01

    Built for the programme

    Warehouse steel is fabricated, marked and sequenced so it erects fast and predictably, which is what keeps a distribution shed on schedule.

  • 02

    Clear spans without compromise

    We fabricate the portal frames that give warehouses their column-free floor, to your engineer's design.

  • 03

    BS EN 1090 Execution Class 2, UKCA marked

    Fabricated to the execution class your engineer specifies, with the declaration of performance to match.

  • 04

    Our own erection teams

    The frame is installed by the firm that fabricated it, coordinated with the cladding and groundworks programmes.

In their own words
Sir Robert McAlpine logo

"I've worked with UIS for several years on some high profile and very complex projects. Their attitude and work ethic are second to none - providing high quality services and products which are delivered safely and on time every time. Overall they are a pleasure to do business with and wouldn't hesitate recommending UIS for any steelwork or metalwork packages."

Stuart Bale
Sir Robert McAlpine
large structural steel project grp large background customer zig zag walkway from steel balustrade
Common questions

Questions clients ask us.

We design, fabricate and install the structural steel frame, secondary steel and any mezzanines. We coordinate with the cladding, roofing and groundworks trades on the programme, so the steel is right and on time for them to follow.

Yes. Clear-span portal frames are exactly what we fabricate for warehouses and distribution centres, so the floor stays open for racking, machinery and vehicle routes.

Yes. We fabricate and install steel mezzanine floors for offices, pick towers and extra storage within the warehouse envelope.

BS EN 1090 Execution Class 2 with UKCA marking, welded by coded welders to BS EN ISO 9606, with the declaration of performance supplied.

We are based in South Yorkshire and design, fabricate and install across the UK with our own teams.