Steel for Chimney Breast Removal
Take a chimney breast out and support what is left above it, with an RSJ or gallows brackets sized by your engineer and made and fitted by us. We detail, fabricate and install to your engineer's design, to BS EN 1090 Execution Class 2 and UKCA marked.

















Holding up what is left above.
Remove a chimney breast on the ground or first floor and the brickwork above it, often another breast and the stack, still has to be held up. That is done either with a steel beam spanning across the opening, or with gallows brackets: steel brackets bolted to the chimney wall that carry the breast above on a cantilever. Your structural engineer decides which suits your chimney and sizes the steel; we produce the fabrication drawings and make it to BS EN 1090 Execution Class 2. Our own team then supports the breast, fits the brackets or beam, and hands over the paperwork building control will want.
Gallows brackets and beams, made to your engineer's design.
The steel that carries the breast above, fabricated and fitted by our own team.
Working to your engineer's design
Your structural engineer decides whether gallows brackets or a beam suit your chimney, and sizes the steel. If you have not appointed one, we can point you in the right direction.
Gallows brackets
Steel brackets bolted to the sound chimney wall carry the breast above on a cantilever, where your engineer confirms the wall can take it.
Support beams
Where brackets will not do, a steel beam or RSJ spans the opening to carry the brickwork and stack above.
Support and removal
The breast above is supported while the lower section is taken out, so nothing is left unheld during the work.
Fitting and paperwork
Our own team fits the brackets or beam and hands over the drawings and declaration of performance for building control.
Take the breast out; hold the stack above.
Whatever is left above the removed breast, brickwork, another breast or the stack, has to be carried, so the steel has to be right. We make the gallows brackets or beam to your engineer's design under BS EN 1090 Execution Class 2 and fit it with our own team, with the drawings and declaration of performance for building control.
Request a quote
Project & sample images.
← Drag / swipe to browse · click to expand →
Why the steel is the part to get right.
Everything above the removed breast leans on this steel, so it is made to the calculations and fitted properly.
About UIS-
01
Made to your engineer's calculations
Gallows brackets or beams are fabricated to the size and detail your structural engineer specifies for the load above.
-
02
Fitted by our own team
The team that makes the steel fits it, so the brackets or beam go in as drawn, tight to the wall they bear on.
-
03
BS EN 1090 Execution Class 2, UKCA marked
Fabricated to the execution class domestic structural steel is specified against, with the declaration of performance supplied.
-
04
Paperwork for sign-off
You get the drawings, weld records and declaration of performance, so building control can inspect and sign the work off.
"I've worked with UIS for several years on some high profile and very complex projects. Their attitude and work ethic are second to none - providing high quality services and products which are delivered safely and on time every time. Overall they are a pleasure to do business with and wouldn't hesitate recommending UIS for any steelwork or metalwork packages."
Questions clients ask us.
Yes. A structural engineer decides how the breast above is supported and sizes the steel, and building control will want their calculations. If you have not got one, we can point you in the right direction.
It depends on the load above and whether the chimney wall is sound enough to carry gallows brackets. Your structural engineer makes that call. We fabricate and fit whichever the design calls for.
If the chimney is on a party wall, the Party Wall Act may apply and your neighbour may need to be served notice. That is a matter for you and your surveyor. We handle the steel once the go-ahead is given.
We supply and fit the supporting steel and can support the breast above while it is done. The removal itself and making good are usually your builder's work, coordinated with us.
We are based in South Yorkshire and fabricate and install across the UK with our own teams.
Recent project deep-dives.
Oban Plant Deck Platform, Scotland
We're proud to announce the successful completion of our latest project - the installation of a plant deck platform in Oban, Scotland....
Read case study →
3 Chamberlain Square Birmingham
We're excited to share a glimpse of our site team's accomplishments as they commenced the installation of the rooftop steelwork in partn...
Read case study →
40T Walkway in Leeds
Big things are happening over in Leeds! One of our teams is beginning to install a 40T walkway. Our dedicated site team has completed the...
Read case study →