Menu

GRP for Housing and Local Authorities

GRP is used in housing blocks and public buildings for stair treads, roof walkways and riser flooring, because it grips in the wet and does not rust. At UIS, we design, fabricate and install GRP for housing associations and councils, using our own site teams.

30 +
Years Experience
1k +
Projects
EXC 2
BS EN 1090
- Spec In-house Design → Install
Certified & compliance-audited
About this service

Where is GRP used in housing and public buildings?

GRP is used on external stairs, flat roofs and risers in housing blocks and public buildings. GRP anti-slip stair treads grip in the wet, GRP roof walkways give maintenance teams a safe route, and GRP riser flooring gives maintenance teams a walk-on floor over the open shaft at each level.

If you are working through stair, roof and riser safety across your properties, the work has to be safe for residents and staff, quick to install in occupied buildings, and not add to the maintenance list.

Where is GRP used in housing and public buildings?
- 30yrs Since 1994 Rotherham · In-house
  1. Stair treads residents can see and grip

    We fix GRP anti-slip treads and nosings over sound external stairs, with contrasting nosings where your access standards ask for them.

  2. Safe routes across flat roofs

    We build GRP walkways and guardrails to the plant on flat roofs, on non-penetrating bases where the roof allows.

  3. Work in occupied buildings

    Our own team works to a method statement in occupied blocks, and your team handles communication with residents.

In detail

What we install in housing blocks

What we install in housing blocks and public buildings, the rules that apply, and what decides each choice.

Stair treads and nosings
GRP anti-slip treads and nosings fixed over sound stairs
Set by: The condition of the stair and the nosing contrast your standards ask for
Roof walkways
GRP grating on non-penetrating or fixed bases, with guardrails where needed
Set by: The roof build-up and the routes to the plant
Riser flooring
GRP grating on a support frame at each floor
Set by: Loads from your engineer, fire class from your fire strategy
Fencing and guarding
GRP palisade or handrail around plant areas
Set by: The area and the security level you specify
Approved Document K
Protection from falling and stair safety in buildings
Source: gov.uk
Approved Document M
Access to and use of buildings, including visible nosings and handrails
Source: gov.uk
Approved Document B
Fire safety; the fire class of riser flooring follows your fire strategy
Source: gov.uk
Work at Height Regulations 2005
Guarded routes for roof maintenance
Source: legislation.gov.uk

This is general information, not legal advice. Your building safety and fire advisers set the requirements for each building.

We price work for housing and public buildings from a survey or a schedule. These are the main things that affect the price:

  1. the number of stairs, roofs and risers
  2. the condition of what is there now
  3. access to occupied buildings
  4. phasing across your properties
  5. working hours
How we work

From survey to handover.

We survey, detail, fabricate and install the GRP ourselves, so one company is responsible for the whole job.

01

Survey and measure

We survey the stairs, roofs and risers on your schedule and agree the priorities with your asset team. On an existing structure we can 3D-scan it, so our drawings match what is on site.

02

Drawings and quotation

Our draughtsmen detail the GRP and any support steelwork to the loads your structural engineer gives us. We then send an itemised quotation that includes fabrication and installation. On major commercial packages the quotation comes back within 1 to 2 weeks.

03

Fabrication

We fabricate the support steelwork and cut the GRP panels and sections to size in our Rotherham workshop, so most of the cutting is done before delivery.

04

Installation

Our own site team installs the GRP under an SSSTS-qualified supervisor, to a method statement written for the job. We cut the GRP to size in our workshop, so there is little cutting on site. Where a panel does need trimming, we cut it with a diamond blade under dust extraction, away from live areas where possible, and no hot-works permit is needed.

05

Handover

At handover we give you the O&M pack, with the manufacturer's test data for the products we installed. The 12-month defect liability period runs from practical completion, in line with standard JCT terms, unless your contract sets different terms.

Why UIS

Why GRP suits housing blocks

GRP does not rust, the gritted surface grips in the wet, and GRP weighs roughly a fifth of the steel equivalent. Stair treads, roof walkways and riser floors go in quickly in occupied buildings and do not need repainting.

Request a quote
large grp mezzanine floor and access staircase sheffield
Examples

Treads and nosings.

← Drag / swipe to browse · click to expand →

Why choose UIS

Where we use GRP in housing and public buildings

These are the main places GRP goes in housing blocks and public buildings.

About UIS
  • 01

    Anti-slip stair treads and nosings

    We fix GRP treads and nosings over sound concrete or steel stairs. The gritted surface grips in wet weather, and we fit contrasting nosings where your access standards ask for them.

  • 02

    Roof maintenance walkways

    We build GRP walkways, step-overs and guardrails on flat roofs, so maintenance teams can reach the plant and gutters on a guarded route.

  • 03

    Riser flooring

    We fit GRP riser flooring at each floor in blocks of flats, to the fire class your fire strategy sets, with lift-out panels for access to the void. GRP riser flooring is a walk-on floor for maintenance access and fall protection. It is not fire stopping: the fire separation between floors comes from the shaft enclosure or a tested fire-stopping system, as your fire strategy sets out.

  • 04

    Installed by our own site teams

    Our own site teams install every job. Each job has an SSSTS-qualified supervisor, every operative holds a CSCS card, and the teams are PASMA and IPAF trained. We write a method statement for each job and plan the work around your site, out of hours where your programme needs it.

In their own words
Sir Robert McAlpine logo

"I've worked with UIS for several years on some high profile and very complex projects. Their attitude and work ethic are second to none - providing high quality services and products which are delivered safely and on time every time. Overall they are a pleasure to do business with and wouldn't hesitate recommending UIS for any steelwork or metalwork packages."

Stuart Bale
Sir Robert McAlpine
large structural steel project grp large background customer zig zag walkway from steel balustrade
Common questions

Questions we get asked.

Often, yes, if the stair is sound. We survey each stair, then fix GRP anti-slip treads and nosings over it, with contrasting nosings where your access standards ask for them.

Yes. We build GRP walkways, step-overs and guardrails so maintenance teams have a guarded route to the plant, on non-penetrating bases where the roof build-up allows.

Yes, where the GRP grade specified meets the fire class your fire strategy sets. Ask for the fire test report for the product. We install to the class your fire strategy requires. GRP riser flooring is a walk-on floor for maintenance access and fall protection. It is not fire stopping: the fire separation between floors comes from the shaft enclosure or a tested fire-stopping system, as your fire strategy sets out.

Yes. Our own team works to a method statement under an SSSTS-qualified supervisor. We agree access and timing with your team, and your team handles communication with residents.

Yes. Send us a schedule of the stairs, roofs and risers, and we will price it and suggest a phasing that suits your programme.